Complete study and upgrades of MEP infrastructures for school district buildings.
Complete MEP/FP design services for a new 3-story building with 112 residential apartment units, courtyard, and a sub-grade parking garage.
The construction of a new 2 story building to serve as an Oncology center for Southampton Hospital.
Full renovation of the 2nd and 3rd floors of an existing multi-story building, totaling more than 57,000 square feet.
Total design of a training facility including all engineering components with a design-build approach.
The MEP/FP design services for a new multi-story apartment building consisting of 90 total apartments. The building is a total of approximately 90,000 square feet.
The renovation of approximately 71,400 square feet of existing space within a pre-engineered building structure located in Hawthorne, N.Y.
The design of a combined science learning center formally located on three floors.
Upgrade the life safety systems in multiple buildings throughout the tristate area. All buildings updated with independent systems that were connected to a campus-wide network and are monitored at a central campus location.